CityGate

We collaborated with McShane Construction on the Lincoln at CityGate Centre, a 285-unit residential development in Naperville, IL. We designed, fabricated, and erected a five-level parking structure enclosed by residential units, featuring a rooftop event space with architectural precast walls. The project, designed by CallisonRTKL, presented challenges in designing deep stem TT products and lower profile precast concrete beams. Construction began in Summer 2021, with completion in 2022.