Details
- Contractor: McShane Construction
- Location: Rosemont, IL
- Number of stories: 6
- Design Features:
- One of the first structures built in the Entertainment District in Rosemont, this six story all precast structure included load bearing exterior and interior walls, hollowcore plank, and elevator/stair shafts.
- Finish: Field painted by others.
Details
- Contractor: McShane Construction
- Location: Rosemont, IL
- Number of stories: 6
- Design Features:
- One of the first structures built in the Entertainment District in Rosemont, this six story all precast structure included load bearing exterior and interior walls, hollowcore plank, and elevator/stair shafts.
- Finish: Field painted by others.
Details
- Contractor: McShane Construction
- Location: Rosemont, IL
- Number of stories: 6
- Design Features:
- One of the first structures built in the Entertainment District in Rosemont, this six story all precast structure included load bearing exterior and interior walls, hollowcore plank, and elevator/stair shafts.
- Finish: Field painted by others.
Details
- Contractor: Walsh Construction
- Location: Lombard, IL
- Design Features: Cast in place podium, load bearing exterior walls, interior walls, hollowcore plank, and elevator/stair shafts. Building was constructed utilizing ATMI Precast “CONTROLLED ACCESS ZONE” safety program to allow other trades to work during precast erection.
- Finish: Factory painted at ATMI and field washed.
Details
- Contractor: Walsh Construction
- Location: Lombard, IL
- Design Features: Cast in place podium, load bearing exterior walls, interior walls, hollowcore plank, and elevator/stair shafts. Building was constructed utilizing ATMI Precast “CONTROLLED ACCESS ZONE” safety program to allow other trades to work during precast erection.
- Finish: Factory painted at ATMI and field washed.
Details
- Contractor: Walsh Construction
- Location: Lombard, IL
- Design Features: Cast in place podium, load bearing exterior walls, interior walls, hollowcore plank, and elevator/stair shafts. Building was constructed utilizing ATMI Precast “CONTROLLED ACCESS ZONE” safety program to allow other trades to work during precast erection.
- Finish: Factory painted at ATMI and field washed.